Hays Commissioners Back $99,990 Shade Structure Bid for Bickle-Schmidt Sports Complex; Vote Set for Tuesday
The Hays City Commission signaled support for awarding a bid to replace the aging shade structure over the playground on the Northeast Quad of the Bickle-Schmidt Sports Complex. Jeff Boyle, Director of Parks, said the existing fabric-topped structure, installed in 2011, was damaged in a storm and has a leaning pole the original installer has declined to repair further, creating a safety concern.
Boyle recommended replacing it with a wood or metal framed structure similar to one installed on the Southwest Quad in 2019, which he said has required minimal maintenance. He said only one vendor, Leitner Buildings of Hays, attended a mandatory pre-bid meeting and submitted a bid of $99,990. The structure is rated for 115 mph wind loads and includes a 40-year warranty on the metal finish and a 50-year warranty on the post columns. The city has spent $28,416 maintaining the current structure since 2011.
The project is funded through the 2026 Special Park and Recreation Budget, which includes $160,000 for the structure and related playground surfacing. Boyle said the structure protects children from foul balls and extends the life of playground equipment. In response to a question about alternatives such as netting, he said that approach would likely cost as much or more and require ongoing maintenance. Commissioners indicated they would move the item forward.
The commission is scheduled to take a formal vote on the item at its regular meeting at 4 p.m. Tuesday, Nov. 24, at City Hall, 1507 Main St.